RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2817032137 - Archived data from Tue, 11. August 2020 18:04:58 CEST


This is all the information about APD 2817032137. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2817032137
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.2 V
Dark current: 13.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 97
Position in Box: 14
EP1 batch: 92
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.291616 V     T = -25 °C: 342.4413488 V
Voltage for Gain 150: T = +20 °C: 385.0642173 V     T = -25 °C: 349.7175026 V
Voltage for Gain 200: T = +20 °C: 389.4103708 V     T = -25 °C: 353.7869779 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.564322642 V-1     T = -25 °C: 4.818172596 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.965779054 V-1     T = -25 °C: 9.919146918 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.927834 V-1     T = -25 °C: 15.92267299 V-1
Break-through voltage: T = +20 °C: 404.5110649 V     T = -25 °C: 368.5065706 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:18:50 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:17 CET jreher Updated box and position via API.
05. Feb 2021 11:00:51 CET jreher Updated box and position via API.
11. Aug 2020 18:04:58 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:24 CEST jreher Updated APD location via API.
17. Feb 2020 17:52:57 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:53 CET jreher Updated APD location via API.
27. Nov 2019 19:46:06 CET jreher Updated APD location via API.
25. Nov 2019 17:18:39 CET jreher Updated box and position via API.
23. Aug 2019 10:15:29 CEST spankonin Updated APD batch assignment via API.
20. Aug 2019 12:44:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:09 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:53 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:17 CEST Tobias Imported from Hamamatsu datasheet.