RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0804007449 - Archived data from Tue, 11. August 2020 17:27:38 CEST


This is all the information about APD 0804007449. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0804007449
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 2.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 53
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.0244646 V     T = -25 °C: 351.8664591 V
Voltage for Gain 150: T = +20 °C: 395.9970925 V     T = -25 °C: 359.4718566 V
Voltage for Gain 200: T = +20 °C: 400.4336634 V     T = -25 °C: 363.7735111 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.396223922 V-1     T = -25 °C: 4.714068936 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.151112659 V-1     T = -25 °C: 9.095352558 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88310913 V-1     T = -25 °C: 15.42405793 V-1
Break-through voltage: T = +20 °C: 415.9398975 V     T = -25 °C: 379.1253714 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:46:15 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:09 CET jreher Updated box and position via API.
03. Feb 2021 18:20:45 CET jreher Updated box and position via API.
11. Aug 2020 17:27:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:04 CET jreher Updated APD location via API.
25. Nov 2019 17:15:05 CET jreher Updated box and position via API.
04. Jul 2019 11:12:26 CEST jreher Updated APD location via API.
18. Jun 2019 13:12:28 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 15:53:28 CEST markus.moritz
22. Jun 2016 15:22:37 CEST Tobias Imported from Hamamatsu datasheet.