RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2816032090 - Archived data from Tue, 11. August 2020 17:59:30 CEST


This is all the information about APD 2816032090. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2816032090
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 390.1 V
Dark current: 10.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 96
Position in Box: 43
EP1 batch: 91
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.5392807 V     T = -25 °C: 354.2629557 V
Voltage for Gain 150: T = +20 °C: 398.3476219 V     T = -25 °C: 361.778611 V
Voltage for Gain 200: T = +20 °C: 402.6748868 V     T = -25 °C: 365.9771889 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.424217235 V-1     T = -25 °C: 4.730288324 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.719025921 V-1     T = -25 °C: 9.598349177 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.3520103 V-1     T = -25 °C: 15.09710998 V-1
Break-through voltage: T = +20 °C: 418.6233466 V     T = -25 °C: 381.2921654 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:46 CET jreher Updated box and position via API.
11. Aug 2020 17:59:30 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:22 CEST jreher Updated APD location via API.
28. Jan 2020 14:54:08 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:51 CET jreher Updated APD location via API.
27. Nov 2019 19:45:57 CET jreher Updated APD location via API.
25. Nov 2019 17:18:36 CET jreher Updated box and position via API.
20. Aug 2019 12:40:47 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:53 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:16 CEST Tobias Imported from Hamamatsu datasheet.