RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2816032072 - Archived data from Tue, 11. August 2020 17:59:27 CEST


This is all the information about APD 2816032072. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2816032072
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 96
Position in Box: 25
EP1 batch: 90
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.0299331 V     T = -25 °C: 348.2969919 V
Voltage for Gain 150: T = +20 °C: 391.8303887 V     T = -25 °C: 355.679071 V
Voltage for Gain 200: T = +20 °C: 396.1596455 V     T = -25 °C: 359.803682 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.630574814 V-1     T = -25 °C: 4.820316047 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.197015977 V-1     T = -25 °C: 9.802036499 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.33751667 V-1     T = -25 °C: 15.60419901 V-1
Break-through voltage: T = +20 °C: 411.69945 V     T = -25 °C: 375.1417416 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:43:14 CET jreher Assigned to capsule by script
05. Feb 2021 11:00:44 CET jreher Updated box and position via API.
18. Dec 2020 14:00:39 CET jreher Updated box and position via API.
11. Aug 2020 17:59:27 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:21 CEST jreher Updated APD location via API.
28. Jan 2020 14:41:01 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:50 CET jreher Updated APD location via API.
27. Nov 2019 19:45:56 CET jreher Updated APD location via API.
25. Nov 2019 17:18:35 CET jreher Updated box and position via API.
20. Aug 2019 12:43:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:52 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:16 CEST Tobias Imported from Hamamatsu datasheet.