RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2816032070 - Archived data from Mon, 25. November 2019 17:18:35 CET


This is all the information about APD 2816032070. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2816032070
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 96
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 96
Position in Box: 23
EP1 batch: 90
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:22:52 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:14 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:44 CET jreher Updated box and position via API.
11. Aug 2020 17:59:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:20 CEST jreher Updated APD location via API.
28. Jan 2020 14:41:01 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:50 CET jreher Updated APD location via API.
27. Nov 2019 19:45:56 CET jreher Updated APD location via API.
25. Nov 2019 17:18:35 CET jreher Updated box and position via API.
20. Aug 2019 12:43:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:52 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:16 CEST Tobias Imported from Hamamatsu datasheet.