RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2816032058 - Archived data from Fri, 05. February 2021 11:00:43 CET


This is all the information about APD 2816032058. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2816032058
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 8.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 96
Position in Box: 13
EP1 batch: 90
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1257012 V     T = -25 °C: 345.6769432 V
Voltage for Gain 150: T = +20 °C: 388.9066496 V     T = -25 °C: 352.9700278 V
Voltage for Gain 200: T = +20 °C: 393.2305934 V     T = -25 °C: 357.0456616 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.620564771 V-1     T = -25 °C: 4.746102947 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.186114454 V-1     T = -25 °C: 9.721309056 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40124524 V-1     T = -25 °C: 15.52158076 V-1
Break-through voltage: T = +20 °C: 408.9076108 V     T = -25 °C: 372.2818225 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:17:46 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:04 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:43 CET jreher Updated box and position via API.
11. Aug 2020 17:59:24 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:19 CEST jreher Updated APD location via API.
28. Jan 2020 14:41:01 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:49 CET jreher Updated APD location via API.
27. Nov 2019 19:45:55 CET jreher Updated APD location via API.
25. Nov 2019 17:18:34 CET jreher Updated box and position via API.
20. Aug 2019 12:43:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:52 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:15 CEST Tobias Imported from Hamamatsu datasheet.