RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2816032055 - Archived data from Tue, 11. August 2020 17:59:24 CEST


This is all the information about APD 2816032055. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2816032055
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 96
Position in Box: 11
EP1 batch: 90
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9670564 V     T = -25 °C: 347.2572491 V
Voltage for Gain 150: T = +20 °C: 390.7631072 V     T = -25 °C: 354.6704441 V
Voltage for Gain 200: T = +20 °C: 395.0901583 V     T = -25 °C: 358.8109761 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.642600319 V-1     T = -25 °C: 4.791120449 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.242977678 V-1     T = -25 °C: 9.783523761 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.42350189 V-1     T = -25 °C: 15.49165669 V-1
Break-through voltage: T = +20 °C: 408.6067957 V     T = -25 °C: 373.3901669 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:54:35 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:47 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:43 CET jreher Updated box and position via API.
11. Aug 2020 17:59:24 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:19 CEST jreher Updated APD location via API.
28. Jan 2020 14:41:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:49 CET jreher Updated APD location via API.
27. Nov 2019 19:45:55 CET jreher Updated APD location via API.
25. Nov 2019 17:18:34 CET jreher Updated box and position via API.
20. Aug 2019 12:43:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:00 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:52 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:15 CEST Tobias Imported from Hamamatsu datasheet.