RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2816032034 - Archived data from Wed, 03. February 2021 18:26:07 CET


This is all the information about APD 2816032034. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2816032034
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 10 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 95
Position in Box: 46
EP1 batch: 89
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1765931 V     T = -25 °C: 350.3557559 V
Voltage for Gain 150: T = +20 °C: 393.9428632 V     T = -25 °C: 357.7579849 V
Voltage for Gain 200: T = +20 °C: 398.2566384 V     T = -25 °C: 361.9002053 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.566453512 V-1     T = -25 °C: 4.75453504 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.10863644 V-1     T = -25 °C: 9.645748011 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.17559475 V-1     T = -25 °C: 15.38155788 V-1
Break-through voltage: T = +20 °C: 412.3412645 V     T = -25 °C: 376.0245449 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:39 CET jreher Updated box and position via API.
03. Feb 2021 18:26:07 CET jreher Updated box and position via API.
11. Aug 2020 17:46:31 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:02:23 CET jreher Updated APD location via API.
29. Nov 2019 11:50:47 CET jreher Updated APD location via API.
27. Nov 2019 19:45:46 CET jreher Updated APD location via API.
25. Nov 2019 17:18:32 CET jreher Updated box and position via API.
14. Nov 2019 17:30:27 CET spankonin Updated APD batch assignment via API.
20. Aug 2019 12:36:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:51 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:14 CEST Tobias Imported from Hamamatsu datasheet.