RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0803007438 - Archived data from Tue, 11. August 2020 17:30:17 CEST


This is all the information about APD 0803007438. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0803007438
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 182
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.0754667 V     T = -25 °C: 350.3468269 V
Voltage for Gain 150: T = +20 °C: 394.0688706 V     T = -25 °C: 357.8970519 V
Voltage for Gain 200: T = +20 °C: 398.4747322 V     T = -25 °C: 362.1112404 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.551180995 V-1     T = -25 °C: 4.699736991 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.163289252 V-1     T = -25 °C: 9.724671675 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28958522 V-1     T = -25 °C: 15.68193429 V-1
Break-through voltage: T = +20 °C: 414.2292877 V     T = -25 °C: 377.3633613 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:50 CET jreher Updated box and position via API.
08. Dec 2020 17:07:02 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:00 CEST vwerner Updated box and position via API.
11. Aug 2020 17:30:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:01:14 CET jreher Updated APD location via API.
25. Nov 2019 17:25:15 CET jreher Updated box and position via API.
13. Aug 2019 12:19:56 CEST jreher Updated APD location via API.
22. Jul 2019 10:52:06 CEST spankonin Updated APD batch assignment via API.
10. Jul 2019 12:13:55 CEST markus.moritz
22. Jun 2016 15:22:37 CEST Tobias Imported from Hamamatsu datasheet.