RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815032006 - Archived data from Wed, 16. June 2021 16:03:31 CEST


This is all the information about APD 2815032006. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815032006
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 95
Position in Box: 30
EP1 batch: 89
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.0880489 V     T = -25 °C: 350.3819212 V
Voltage for Gain 150: T = +20 °C: 393.8650649 V     T = -25 °C: 357.8033295 V
Voltage for Gain 200: T = +20 °C: 398.1625068 V     T = -25 °C: 361.9690234 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.634959226 V-1     T = -25 °C: 4.75682128 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.286301315 V-1     T = -25 °C: 9.641215626 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56847255 V-1     T = -25 °C: 15.34966147 V-1
Break-through voltage: T = +20 °C: 412.563856 V     T = -25 °C: 376.7792482 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:34:49 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:31 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:49 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:37 CET jreher Updated box and position via API.
03. Feb 2021 18:26:05 CET jreher Updated box and position via API.
11. Aug 2020 17:46:28 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:02:22 CET jreher Updated APD location via API.
29. Nov 2019 11:50:46 CET jreher Updated APD location via API.
27. Nov 2019 19:45:45 CET jreher Updated APD location via API.
25. Nov 2019 17:18:31 CET jreher Updated box and position via API.
14. Nov 2019 17:30:26 CET spankonin Updated APD batch assignment via API.
20. Aug 2019 12:36:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:51 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:14 CEST Tobias Imported from Hamamatsu datasheet.