RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031995 - Archived data from Tue, 11. August 2020 17:46:27 CEST


This is all the information about APD 2815031995. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031995
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 20.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 95
Position in Box: 22
EP1 batch: 89
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8222086 V     T = -25 °C: 345.5284311 V
Voltage for Gain 150: T = +20 °C: 388.6192669 V     T = -25 °C: 352.8351968 V
Voltage for Gain 200: T = +20 °C: 392.9455051 V     T = -25 °C: 356.9121919 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.743992106 V-1     T = -25 °C: 4.799794561 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.562253343 V-1     T = -25 °C: 9.892504712 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00672735 V-1     T = -25 °C: 15.96440156 V-1
Break-through voltage: T = +20 °C: 408.0870328 V     T = -25 °C: 371.6810808 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:36 CET jreher Updated box and position via API.
03. Feb 2021 18:26:04 CET jreher Updated box and position via API.
29. Jan 2021 10:27:13 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:33 CEST jreher Updated box and position via API.
11. Aug 2020 17:46:27 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:02:22 CET jreher Updated APD location via API.
29. Nov 2019 11:50:46 CET jreher Updated APD location via API.
27. Nov 2019 19:45:44 CET jreher Updated APD location via API.
25. Nov 2019 17:18:30 CET jreher Updated box and position via API.
14. Nov 2019 17:30:25 CET spankonin Updated APD batch assignment via API.
20. Aug 2019 12:36:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:51 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:13 CEST Tobias Imported from Hamamatsu datasheet.