Show Hamamatsu Avalanche Photo Diode 2815031983 - Archived data from Thu, 03. January 2019 00:13:50 CET
This is all the information about APD 2815031983. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2815031983 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | unknown |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | H08 |
Break-through voltage: | 413 V |
Voltage for Gain 100 (T=+25°C): | 386 V |
Dark current: | 7.1 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 95 |
Position in Box: | 11 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:00:34 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:26:03 CET | jreher | Updated box and position via API. |
08. Dec 2020 17:18:02 CET | jreher | Assigned to capsule by script |
06. Oct 2020 16:53:09 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:46:24 CEST | jreher | Updated APD characteristics via API. |
03. Dec 2019 15:02:21 CET | jreher | Updated APD location via API. |
29. Nov 2019 11:50:45 CET | jreher | Updated APD location via API. |
27. Nov 2019 19:45:44 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:18:29 CET | jreher | Updated box and position via API. |
14. Nov 2019 17:30:11 CET | spankonin | Updated APD batch assignment via API. |
20. Aug 2019 12:35:51 CEST | jgrochowski | Updated APD batch assignment via API. |
05. Jul 2019 13:48:52 CEST | jreher | Updated APD location via API. |
03. Jan 2019 00:13:50 CET | Tobias | Corrected dark current unit. |
20. Jun 2018 13:36:13 CEST | Tobias | Imported from Hamamatsu datasheet. |