RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031983 - Archived data from Tue, 06. October 2020 16:53:09 CEST


This is all the information about APD 2815031983. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031983
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 386 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 95
Position in Box: 11
EP1 batch: 88
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1318636 V     T = -25 °C: 349.4634019 V
Voltage for Gain 150: T = +20 °C: 393.8494574 V     T = -25 °C: 357.0005669 V
Voltage for Gain 200: T = +20 °C: 398.0363686 V     T = -25 °C: 361.2367006 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.760788876 V-1     T = -25 °C: 4.674134842 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.52293307 V-1     T = -25 °C: 9.254371449 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.06519859 V-1     T = -25 °C: 14.39029374 V-1
Break-through voltage: T = +20 °C: 412.5773887 V     T = -25 °C: 376.3551532 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:34 CET jreher Updated box and position via API.
03. Feb 2021 18:26:03 CET jreher Updated box and position via API.
08. Dec 2020 17:18:02 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:46:24 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:02:21 CET jreher Updated APD location via API.
29. Nov 2019 11:50:45 CET jreher Updated APD location via API.
27. Nov 2019 19:45:44 CET jreher Updated APD location via API.
25. Nov 2019 17:18:29 CET jreher Updated box and position via API.
14. Nov 2019 17:30:11 CET spankonin Updated APD batch assignment via API.
20. Aug 2019 12:35:51 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:50 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:13 CEST Tobias Imported from Hamamatsu datasheet.