RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031977 - Archived data from Thu, 03. September 2020 14:25:43 CEST


This is all the information about APD 2815031977. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031977
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2512028446/2815031977
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 95
Position in Box: 5
EP1 batch: 88
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1011722 V     T = -25 °C: 345.5955505 V
Voltage for Gain 150: T = +20 °C: 388.9250595 V     T = -25 °C: 352.9384114 V
Voltage for Gain 200: T = +20 °C: 393.2902436 V     T = -25 °C: 357.0642295 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.475445219 V-1     T = -25 °C: 4.725747095 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.407432202 V-1     T = -25 °C: 9.528581018 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.5996892 V-1     T = -25 °C: 15.14779397 V-1
Break-through voltage: T = +20 °C: 408.8728124 V     T = -25 °C: 372.3644257 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:34 CET jreher Updated box and position via API.
03. Feb 2021 18:26:02 CET jreher Updated box and position via API.
03. Sep 2020 14:25:43 CEST jreher Assigned to capsule by script
11. Aug 2020 17:46:23 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:23:30 CET jreher Updated box and position via API.
03. Dec 2019 15:02:20 CET jreher Updated APD location via API.
29. Nov 2019 11:50:44 CET jreher Updated APD location via API.
27. Nov 2019 19:45:43 CET jreher Updated APD location via API.
25. Nov 2019 17:18:29 CET jreher Updated box and position via API.
14. Nov 2019 17:30:10 CET spankonin Updated APD batch assignment via API.
20. Aug 2019 12:35:50 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:50 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:13 CEST Tobias Imported from Hamamatsu datasheet.