RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031976


This is all the information about APD 2815031976. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031976
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2005021823/2815031976
Unit: #3489 (barcode 1309038862)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 95
Position in Box: 4
EP1 batch: 88
EP1 batch after irradiation: 10264
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.746697 V     T = -25 °C: 346.1712336 V
Voltage for Gain 150: T = +20 °C: 389.553224 V     T = -25 °C: 353.5231541 V
Voltage for Gain 200: T = +20 °C: 393.803816 V     T = -25 °C: 357.6320791 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.857792646 V-1     T = -25 °C: 4.859585179 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.740632572 V-1     T = -25 °C: 9.97062158 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.37280361 V-1     T = -25 °C: 16.00012202 V-1
Break-through voltage: T = +20 °C: 409.1327256 V     T = -25 °C: 372.8664419 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
27. Jun 2022 12:42:49 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:55 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:10 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:51 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:33 CET jreher Updated box and position via API.
03. Feb 2021 18:26:02 CET jreher Updated box and position via API.
11. Aug 2020 17:46:23 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:02:20 CET jreher Updated APD location via API.
29. Nov 2019 11:50:44 CET jreher Updated APD location via API.
27. Nov 2019 19:45:43 CET jreher Updated APD location via API.
25. Nov 2019 17:18:29 CET jreher Updated box and position via API.
14. Nov 2019 17:30:10 CET spankonin Updated APD batch assignment via API.
20. Aug 2019 12:35:50 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:50 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:13 CEST Tobias Imported from Hamamatsu datasheet.