RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031966 - Archived data from Fri, 05. July 2019 13:48:47 CEST


This is all the information about APD 2815031966. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031966
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 94
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 94
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 16:34:22 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:30 CET jreher Updated box and position via API.
03. Feb 2021 18:25:59 CET jreher Updated box and position via API.
11. Aug 2020 17:59:20 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:18 CEST jreher Updated APD location via API.
28. Jan 2020 14:39:34 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:43 CET jreher Updated APD location via API.
27. Nov 2019 19:45:35 CET jreher Updated APD location via API.
25. Nov 2019 17:18:27 CET jreher Updated box and position via API.
20. Aug 2019 12:35:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:50 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:12 CEST Tobias Imported from Hamamatsu datasheet.