RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2815031958 - Archived data from Wed, 03. February 2021 18:25:58 CET


This is all the information about APD 2815031958. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2815031958
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 94
Position in Box: 37
EP1 batch: 88
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7518952 V     T = -25 °C: 343.4158538 V
Voltage for Gain 150: T = +20 °C: 386.5264959 V     T = -25 °C: 350.7159807 V
Voltage for Gain 200: T = +20 °C: 390.8522192 V     T = -25 °C: 354.7961719 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.704792276 V-1     T = -25 °C: 4.775476986 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.350165742 V-1     T = -25 °C: 9.794347235 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58353706 V-1     T = -25 °C: 15.63516844 V-1
Break-through voltage: T = +20 °C: 406.0343644 V     T = -25 °C: 369.6648541 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:29 CET jreher Updated box and position via API.
03. Feb 2021 18:25:58 CET jreher Updated box and position via API.
11. Aug 2020 17:59:19 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:17 CEST jreher Updated APD location via API.
28. Jan 2020 14:39:33 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:43 CET jreher Updated APD location via API.
27. Nov 2019 19:45:34 CET jreher Updated APD location via API.
25. Nov 2019 17:18:26 CET jreher Updated box and position via API.
20. Aug 2019 12:35:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:50 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:12 CEST Tobias Imported from Hamamatsu datasheet.