RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2814031919 - Archived data from Wed, 16. June 2021 16:03:44 CEST


This is all the information about APD 2814031919. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2814031919
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 10.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 94
Position in Box: 22
EP1 batch: 87
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7162361 V     T = -25 °C: 350.1413199 V
Voltage for Gain 150: T = +20 °C: 393.5690488 V     T = -25 °C: 357.5976311 V
Voltage for Gain 200: T = +20 °C: 397.9198445 V     T = -25 °C: 361.7620838 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.667463106 V-1     T = -25 °C: 4.78269099 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.274974438 V-1     T = -25 °C: 9.689440663 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.4547082 V-1     T = -25 °C: 15.38335893 V-1
Break-through voltage: T = +20 °C: 412.7121985 V     T = -25 °C: 376.4980595 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:25:49 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:44 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:01 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:42 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:28 CET jreher Updated box and position via API.
03. Feb 2021 18:25:56 CET jreher Updated box and position via API.
11. Aug 2020 17:59:16 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:16 CEST jreher Updated APD location via API.
28. Jan 2020 14:36:56 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:42 CET jreher Updated APD location via API.
27. Nov 2019 19:45:33 CET jreher Updated APD location via API.
25. Nov 2019 17:18:25 CET jreher Updated box and position via API.
20. Aug 2019 12:35:28 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:49 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:11 CEST Tobias Imported from Hamamatsu datasheet.