RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2814031908 - Archived data from Tue, 11. August 2020 17:59:14 CEST


This is all the information about APD 2814031908. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2814031908
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 9.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 94
Position in Box: 13
EP1 batch: 87
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.8262598 V     T = -25 °C: 351.8658266 V
Voltage for Gain 150: T = +20 °C: 395.6145677 V     T = -25 °C: 359.2934558 V
Voltage for Gain 200: T = +20 °C: 399.9207739 V     T = -25 °C: 363.45377 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.712301042 V-1     T = -25 °C: 4.927227125 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.405053541 V-1     T = -25 °C: 9.172551757 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85804864 V-1     T = -25 °C: 16.38275761 V-1
Break-through voltage: T = +20 °C: 414.0696409 V     T = -25 °C: 377.675957 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:27 CET jreher Updated box and position via API.
03. Feb 2021 18:25:56 CET jreher Updated box and position via API.
11. Aug 2020 17:59:14 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:15 CEST jreher Updated APD location via API.
28. Jan 2020 14:36:56 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:41 CET jreher Updated APD location via API.
27. Nov 2019 19:45:33 CET jreher Updated APD location via API.
25. Nov 2019 17:18:25 CET jreher Updated box and position via API.
20. Aug 2019 12:35:27 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:49 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:11 CEST Tobias Imported from Hamamatsu datasheet.