RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2814031884 - Archived data from Wed, 03. February 2021 18:25:54 CET


This is all the information about APD 2814031884. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2814031884
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 94
Position in Box: 3
EP1 batch: 86
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4697517 V     T = -25 °C: 346.948174 V
Voltage for Gain 150: T = +20 °C: 390.2398816 V     T = -25 °C: 354.2800658 V
Voltage for Gain 200: T = +20 °C: 394.5593477 V     T = -25 °C: 358.3873696 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.495237307 V-1     T = -25 °C: 4.979474077 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.819267145 V-1     T = -25 °C: 9.292333846 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.51381133 V-1     T = -25 °C: 14.69894799 V-1
Break-through voltage: T = +20 °C: 409.1240494 V     T = -25 °C: 372.7309544 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:26 CET jreher Updated box and position via API.
03. Feb 2021 18:25:54 CET jreher Updated box and position via API.
11. Aug 2020 17:59:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:14 CEST jreher Updated APD location via API.
28. Jan 2020 14:36:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:40 CET jreher Updated APD location via API.
27. Nov 2019 19:45:32 CET jreher Updated APD location via API.
25. Nov 2019 17:18:24 CET jreher Updated box and position via API.
20. Aug 2019 12:35:04 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:48 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:11 CEST Tobias Imported from Hamamatsu datasheet.