RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2814031866 - Archived data from Fri, 05. February 2021 11:00:22 CET


This is all the information about APD 2814031866. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2814031866
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 93
Position in Box: 37
EP1 batch: 86
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7863071 V     T = -25 °C: 345.5493992 V
Voltage for Gain 150: T = +20 °C: 388.6540142 V     T = -25 °C: 352.9391343 V
Voltage for Gain 200: T = +20 °C: 393.0434329 V     T = -25 °C: 357.1120949 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.652565525 V-1     T = -25 °C: 4.687435007 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.176164684 V-1     T = -25 °C: 9.399313341 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.19573407 V-1     T = -25 °C: 14.79126178 V-1
Break-through voltage: T = +20 °C: 408.3625403 V     T = -25 °C: 372.5326035 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:22:18 CET jreher Assigned to capsule by script
05. Feb 2021 11:00:22 CET jreher Updated box and position via API.
03. Feb 2021 18:25:50 CET jreher Updated box and position via API.
18. Dec 2020 14:00:20 CET jreher Updated box and position via API.
11. Aug 2020 17:59:09 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:13 CEST jreher Updated APD location via API.
28. Jan 2020 14:35:05 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:39 CET jreher Updated APD location via API.
27. Nov 2019 19:45:23 CET jreher Updated APD location via API.
25. Nov 2019 17:18:21 CET jreher Updated box and position via API.
20. Aug 2019 12:35:03 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:48 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:10 CEST Tobias Imported from Hamamatsu datasheet.