RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2814031852 - Archived data from Tue, 11. August 2020 17:59:07 CEST


This is all the information about APD 2814031852. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2814031852
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 93
Position in Box: 26
EP1 batch: 86
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4039898 V     T = -25 °C: 343.9537949 V
Voltage for Gain 150: T = +20 °C: 385.8731053 V     T = -25 °C: 351.2230863 V
Voltage for Gain 200: T = +20 °C: 390.2347878 V     T = -25 °C: 355.3752276 V
Gain/Voltage slope at M = 100: T = +20 °C: 11.05838024 V-1     T = -25 °C: 5.101339326 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.065647096 V-1     T = -25 °C: 10.7422534 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.06133124 V-1     T = -25 °C: 14.43549458 V-1
Break-through voltage: T = +20 °C: 406.263684 V     T = -25 °C: 370.8626774 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:14:51 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:50 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:20 CET jreher Updated box and position via API.
03. Feb 2021 18:25:48 CET jreher Updated box and position via API.
11. Aug 2020 17:59:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:12 CEST jreher Updated APD location via API.
28. Jan 2020 14:35:04 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:38 CET jreher Updated APD location via API.
27. Nov 2019 19:45:22 CET jreher Updated APD location via API.
25. Nov 2019 17:18:19 CET jreher Updated box and position via API.
20. Aug 2019 12:35:02 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:48 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:10 CEST Tobias Imported from Hamamatsu datasheet.