RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2814031849 - Archived data from Wed, 03. February 2021 18:25:48 CET


This is all the information about APD 2814031849. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2814031849
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.2 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 93
Position in Box: 13
EP1 batch: 85
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5572205 V     T = -25 °C: 349.6558333 V
Voltage for Gain 150: T = +20 °C: 392.4805204 V     T = -25 °C: 357.1136918 V
Voltage for Gain 200: T = +20 °C: 396.8669961 V     T = -25 °C: 361.4771295 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.392706894 V-1     T = -25 °C: 4.517797565 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.463117189 V-1     T = -25 °C: 8.936122587 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6182655 V-1     T = -25 °C: 15.94384601 V-1
Break-through voltage: T = +20 °C: 412.0277301 V     T = -25 °C: 375.6849047 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:05 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:20 CET jreher Updated box and position via API.
03. Feb 2021 18:25:48 CET jreher Updated box and position via API.
11. Aug 2020 17:59:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:11 CEST jreher Updated APD location via API.
28. Jan 2020 14:35:04 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:38 CET jreher Updated APD location via API.
27. Nov 2019 19:45:22 CET jreher Updated APD location via API.
25. Nov 2019 17:18:19 CET jreher Updated box and position via API.
20. Aug 2019 12:34:42 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:37 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:47 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:09 CEST Tobias Imported from Hamamatsu datasheet.