RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2813031801 - Archived data from Tue, 11. August 2020 17:59:04 CEST


This is all the information about APD 2813031801. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2813031801
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 93
Position in Box: 8
EP1 batch: 85
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2900515 V     T = -25 °C: 346.946135 V
Voltage for Gain 150: T = +20 °C: 390.1571006 V     T = -25 °C: 354.4028461 V
Voltage for Gain 200: T = +20 °C: 394.5331702 V     T = -25 °C: 358.5720259 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.478995188 V-1     T = -25 °C: 4.897075562 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.723236445 V-1     T = -25 °C: 8.898968088 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13717239 V-1     T = -25 °C: 15.73597108 V-1
Break-through voltage: T = +20 °C: 409.9363135 V     T = -25 °C: 374.0717847 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:24:57 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:25 CEST oafedulidis Updated box and position via API.
03. May 2021 10:26:05 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:19 CET jreher Updated box and position via API.
03. Feb 2021 18:25:46 CET jreher Updated box and position via API.
11. Aug 2020 17:59:04 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:10 CEST jreher Updated APD location via API.
28. Jan 2020 14:22:10 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:37 CET jreher Updated APD location via API.
27. Nov 2019 19:45:21 CET jreher Updated APD location via API.
25. Nov 2019 17:18:18 CET jreher Updated box and position via API.
20. Aug 2019 12:34:41 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:36 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:47 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:09 CEST Tobias Imported from Hamamatsu datasheet.