RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0803007424 - Archived data from Tue, 11. August 2020 17:43:03 CEST


This is all the information about APD 0803007424. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0803007424
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 236
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3281822 V     T = -25 °C: 344.5510104 V
Voltage for Gain 150: T = +20 °C: 388.1769641 V     T = -25 °C: 351.9145284 V
Voltage for Gain 200: T = +20 °C: 392.5228334 V     T = -25 °C: 356.0822541 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.432662681 V-1     T = -25 °C: 4.715804891 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.722819873 V-1     T = -25 °C: 9.449354254 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21756282 V-1     T = -25 °C: 14.77147187 V-1
Break-through voltage: T = +20 °C: 407.9283907 V     T = -25 °C: 371.4686539 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:43 CET jreher Updated box and position via API.
11. Aug 2020 17:43:03 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:20 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:10 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:20 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:30 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:38 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:37 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:50 CET jreher Updated APD location via API.
25. Nov 2019 17:29:13 CET jreher Updated box and position via API.
22. Oct 2019 16:36:27 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:17:09 CEST spankonin Updated APD location via API.
22. Jun 2016 15:22:36 CEST Tobias Imported from Hamamatsu datasheet.