RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2813031778 - Archived data from Fri, 05. February 2021 11:00:15 CET


This is all the information about APD 2813031778. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2813031778
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 44
EP1 batch: 85
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1820974 V     T = -25 °C: 344.7424182 V
Voltage for Gain 150: T = +20 °C: 387.9689299 V     T = -25 °C: 352.0761202 V
Voltage for Gain 200: T = +20 °C: 392.3029508 V     T = -25 °C: 356.1948702 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.568835398 V-1     T = -25 °C: 5.045661374 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.08932437 V-1     T = -25 °C: 9.473258049 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.13456024 V-1     T = -25 °C: 15.03045602 V-1
Break-through voltage: T = +20 °C: 407.654322 V     T = -25 °C: 371.3283498 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:03 CEST jreher Updated box and position via API.
14. Apr 2021 18:13:33 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:00:15 CET jreher Updated box and position via API.
03. Feb 2021 18:25:43 CET jreher Updated box and position via API.
11. Aug 2020 18:04:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:09 CEST jreher Updated APD location via API.
17. Feb 2020 17:52:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:36 CET jreher Updated APD location via API.
27. Nov 2019 19:45:13 CET jreher Updated APD location via API.
25. Nov 2019 17:18:15 CET jreher Updated box and position via API.
20. Aug 2019 12:34:40 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:47 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.