RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031755 - Archived data from Wed, 03. February 2021 18:25:42 CET


This is all the information about APD 2812031755. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031755
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 40
EP1 batch: 84
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9324242 V     T = -25 °C: 343.7848844 V
Voltage for Gain 150: T = +20 °C: 386.7763073 V     T = -25 °C: 351.1484644 V
Voltage for Gain 200: T = +20 °C: 391.1490819 V     T = -25 °C: 355.2966419 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.666045565 V-1     T = -25 °C: 5.040927921 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.21208089 V-1     T = -25 °C: 9.379085189 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34089249 V-1     T = -25 °C: 14.79143438 V-1
Break-through voltage: T = +20 °C: 406.9105598 V     T = -25 °C: 370.7763029 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:39:35 CET jreher Assigned to capsule by script
05. Feb 2021 11:00:14 CET jreher Updated box and position via API.
03. Feb 2021 18:25:42 CET jreher Updated box and position via API.
18. Dec 2020 14:01:07 CET jreher Updated box and position via API.
11. Aug 2020 18:04:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:08 CEST jreher Updated APD location via API.
17. Feb 2020 17:52:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:36 CET jreher Updated APD location via API.
27. Nov 2019 19:45:12 CET jreher Updated APD location via API.
25. Nov 2019 17:18:15 CET jreher Updated box and position via API.
20. Aug 2019 12:34:22 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:46 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.