RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031750 - Archived data from Wed, 21. April 2021 11:02:31 CEST


This is all the information about APD 2812031750. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031750
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 386.3 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 35
EP1 batch: 84
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6728684 V     T = -25 °C: 350.7770885 V
Voltage for Gain 150: T = +20 °C: 394.4878863 V     T = -25 °C: 358.2443733 V
Voltage for Gain 200: T = +20 °C: 398.8037973 V     T = -25 °C: 362.4306015 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.414479426 V-1     T = -25 °C: 4.968547653 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.648599837 V-1     T = -25 °C: 9.188627218 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18380623 V-1     T = -25 °C: 14.52457525 V-1
Break-through voltage: T = +20 °C: 413.2317341 V     T = -25 °C: 377.1428332 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:40:01 CET oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:31 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:13 CET jreher Updated box and position via API.
03. Feb 2021 18:25:42 CET jreher Updated box and position via API.
11. Aug 2020 18:04:52 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:08 CEST jreher Updated APD location via API.
17. Feb 2020 17:52:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:35 CET jreher Updated APD location via API.
27. Nov 2019 19:45:12 CET jreher Updated APD location via API.
25. Nov 2019 17:18:15 CET jreher Updated box and position via API.
20. Aug 2019 12:34:22 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:46 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.