RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0803007422 - Archived data from Thu, 15. April 2021 17:01:26 CEST


This is all the information about APD 0803007422. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0803007422
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 382.2 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 236
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.073345 V     T = -25 °C: 346.8777966 V
Voltage for Gain 150: T = +20 °C: 390.9204533 V     T = -25 °C: 354.3875975 V
Voltage for Gain 200: T = +20 °C: 395.2759481 V     T = -25 °C: 358.6061867 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.531058952 V-1     T = -25 °C: 4.907911732 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.050170142 V-1     T = -25 °C: 8.904480706 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05206932 V-1     T = -25 °C: 15.6876102 V-1
Break-through voltage: T = +20 °C: 409.9232414 V     T = -25 °C: 373.6796024 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:11:30 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:26 CEST jreher Updated box and position via API.
05. Feb 2021 11:18:42 CET jreher Updated box and position via API.
11. Aug 2020 17:43:03 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:20 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:09 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:20 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:30 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:38 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:37 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:50 CET jreher Updated APD location via API.
25. Nov 2019 17:29:13 CET jreher Updated box and position via API.
22. Oct 2019 16:36:27 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:17:09 CEST spankonin Updated APD location via API.
22. Jun 2016 15:22:36 CEST Tobias Imported from Hamamatsu datasheet.