RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031742 - Archived data from Tue, 11. August 2020 18:04:51 CEST


This is all the information about APD 2812031742. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031742
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 29
EP1 batch: 84
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7699389 V     T = -25 °C: 344.3147704 V
Voltage for Gain 150: T = +20 °C: 387.5770945 V     T = -25 °C: 351.7423142 V
Voltage for Gain 200: T = +20 °C: 391.9067059 V     T = -25 °C: 355.8744601 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.689164974 V-1     T = -25 °C: 4.798936497 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.567481174 V-1     T = -25 °C: 9.526822123 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.76522422 V-1     T = -25 °C: 15.66010523 V-1
Break-through voltage: T = +20 °C: 406.9905179 V     T = -25 °C: 370.8192595 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:13 CET jreher Updated box and position via API.
03. Feb 2021 18:25:41 CET jreher Updated box and position via API.
11. Aug 2020 18:04:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:07 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:35 CET jreher Updated APD location via API.
27. Nov 2019 19:45:11 CET jreher Updated APD location via API.
25. Nov 2019 17:18:14 CET jreher Updated box and position via API.
20. Aug 2019 12:34:21 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:46 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:08 CEST Tobias Imported from Hamamatsu datasheet.