RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031728 - Archived data from Tue, 11. August 2020 18:04:49 CEST


This is all the information about APD 2812031728. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031728
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 15
EP1 batch: 84
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1130865 V     T = -25 °C: 344.7615549 V
Voltage for Gain 150: T = +20 °C: 386.9301205 V     T = -25 °C: 352.1816051 V
Voltage for Gain 200: T = +20 °C: 391.3030857 V     T = -25 °C: 356.2467419 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.573221308 V-1     T = -25 °C: 4.949365605 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.97353449 V-1     T = -25 °C: 8.593160826 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92955102 V-1     T = -25 °C: 15.07444936 V-1
Break-through voltage: T = +20 °C: 407.1301141 V     T = -25 °C: 371.6910004 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:11 CET jreher Updated box and position via API.
03. Feb 2021 18:25:39 CET jreher Updated box and position via API.
11. Aug 2020 18:04:49 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:06 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:34 CET jreher Updated APD location via API.
27. Nov 2019 19:45:10 CET jreher Updated APD location via API.
25. Nov 2019 17:18:13 CET jreher Updated box and position via API.
20. Aug 2019 12:34:20 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:28 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:46 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:07 CEST Tobias Imported from Hamamatsu datasheet.