RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031724 - Archived data from Wed, 03. February 2021 18:25:39 CET


This is all the information about APD 2812031724. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031724
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 92
Position in Box: 12
EP1 batch: 84
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9978479 V     T = -25 °C: 344.4171555 V
Voltage for Gain 150: T = +20 °C: 385.8853265 V     T = -25 °C: 352.0167012 V
Voltage for Gain 200: T = +20 °C: 390.3002771 V     T = -25 °C: 356.2602038 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.578431858 V-1     T = -25 °C: 4.733644211 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.002820889 V-1     T = -25 °C: 9.623595252 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.84049092 V-1     T = -25 °C: 14.11854475 V-1
Break-through voltage: T = +20 °C: 405.5890642 V     T = -25 °C: 371.3062142 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:11 CET jreher Updated box and position via API.
03. Feb 2021 18:25:39 CET jreher Updated box and position via API.
11. Aug 2020 18:04:48 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:06 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:34 CET jreher Updated APD location via API.
27. Nov 2019 19:45:10 CET jreher Updated APD location via API.
25. Nov 2019 17:18:13 CET jreher Updated box and position via API.
20. Aug 2019 12:34:20 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:28 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:45 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:07 CEST Tobias Imported from Hamamatsu datasheet.