RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2812031703 - Archived data from Wed, 03. February 2021 18:25:35 CET


This is all the information about APD 2812031703. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031703
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 10.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 45
EP1 batch: 83
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0359354 V     T = -25 °C: 343.8731047 V
Voltage for Gain 150: T = +20 °C: 386.832469 V     T = -25 °C: 351.2163392 V
Voltage for Gain 200: T = +20 °C: 391.1793963 V     T = -25 °C: 355.3357795 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.622607217 V-1     T = -25 °C: 4.971361002 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.093612764 V-1     T = -25 °C: 9.239208622 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.13444344 V-1     T = -25 °C: 16.58155248 V-1
Break-through voltage: T = +20 °C: 406.2013168 V     T = -25 °C: 370.1519858 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:39:28 CET jreher Assigned to capsule by script
05. Feb 2021 11:00:07 CET jreher Updated box and position via API.
03. Feb 2021 18:25:35 CET jreher Updated box and position via API.
18. Dec 2020 14:01:07 CET jreher Updated box and position via API.
11. Aug 2020 18:04:45 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:04 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:54 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:32 CET jreher Updated APD location via API.
27. Nov 2019 19:45:02 CET jreher Updated APD location via API.
25. Nov 2019 17:18:11 CET jreher Updated box and position via API.
20. Aug 2019 12:33:54 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:23 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:45 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:06 CEST Tobias Imported from Hamamatsu datasheet.