Show Hamamatsu Avalanche Photo Diode 2812031694 - Archived data from Mon, 15. February 2021 15:37:24 CET


This is all the information about APD 2812031694. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2812031694
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2812031694/2304024421
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 91
Position in Box: 36
EP1 batch: 83
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1612295 V     T = -25 °C: 346.9321565 V
Voltage for Gain 150: T = +20 °C: 389.9425035 V     T = -25 °C: 354.2761233 V
Voltage for Gain 200: T = +20 °C: 394.2771028 V     T = -25 °C: 358.3945222 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.567957097 V-1     T = -25 °C: 4.973539159 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.082542055 V-1     T = -25 °C: 9.24407904 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.09562291 V-1     T = -25 °C: 16.63363224 V-1
Break-through voltage: T = +20 °C: 409.2905604 V     T = -25 °C: 373.2417272 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:03 CET jreher Updated box and position via API.
15. Feb 2021 15:37:24 CET jreher Assigned to capsule by script
05. Feb 2021 11:00:06 CET jreher Updated box and position via API.
03. Feb 2021 18:25:34 CET jreher Updated box and position via API.
11. Aug 2020 18:04:43 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:03 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:54 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:32 CET jreher Updated APD location via API.
27. Nov 2019 19:45:01 CET jreher Updated APD location via API.
25. Nov 2019 17:18:10 CET jreher Updated box and position via API.
20. Aug 2019 12:33:53 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:45 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:06 CEST Tobias Imported from Hamamatsu datasheet.