RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2811031661 - Archived data from Wed, 16. June 2021 15:51:44 CEST


This is all the information about APD 2811031661. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2811031661
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F13
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 11.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 12
EP1 batch: 82
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7252578 V     T = -25 °C: 344.5100786 V
Voltage for Gain 150: T = +20 °C: 387.5072638 V     T = -25 °C: 351.8473623 V
Voltage for Gain 200: T = +20 °C: 391.8390296 V     T = -25 °C: 355.9462195 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.422648787 V-1     T = -25 °C: 4.792780128 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.693813705 V-1     T = -25 °C: 9.839395153 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.24712726 V-1     T = -25 °C: 15.82482652 V-1
Break-through voltage: T = +20 °C: 407.3797221 V     T = -25 °C: 371.1733513 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:41:55 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:37 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:58:55 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:44 CEST oafedulidis Updated box and position via API.
03. May 2021 10:27:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:04 CET jreher Updated box and position via API.
03. Feb 2021 18:25:32 CET jreher Updated box and position via API.
11. Aug 2020 18:04:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:02 CEST jreher Updated APD location via API.
17. Feb 2020 17:54:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:31 CET jreher Updated APD location via API.
27. Nov 2019 19:45:00 CET jreher Updated APD location via API.
25. Nov 2019 17:18:09 CET jreher Updated box and position via API.
20. Aug 2019 12:32:46 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:21 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:44 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:06 CEST Tobias Imported from Hamamatsu datasheet.