RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2811031660 - Archived data from Tue, 11. August 2020 18:04:40 CEST


This is all the information about APD 2811031660. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2811031660
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 11
EP1 batch: 82
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.847056 V     T = -25 °C: 345.56552 V
Voltage for Gain 150: T = +20 °C: 388.6187758 V     T = -25 °C: 352.987354 V
Voltage for Gain 200: T = +20 °C: 392.9989719 V     T = -25 °C: 357.157312 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.590513184 V-1     T = -25 °C: 4.731359853 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.071385271 V-1     T = -25 °C: 9.610755806 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53670735 V-1     T = -25 °C: 15.29116025 V-1
Break-through voltage: T = +20 °C: 407.8558367 V     T = -25 °C: 372.4363566 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:27:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:04 CET jreher Updated box and position via API.
03. Feb 2021 18:25:32 CET jreher Updated box and position via API.
11. Aug 2020 18:04:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:02 CEST jreher Updated APD location via API.
17. Feb 2020 17:55:24 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:31 CET jreher Updated APD location via API.
27. Nov 2019 19:45:00 CET jreher Updated APD location via API.
25. Nov 2019 17:18:09 CET jreher Updated box and position via API.
20. Aug 2019 12:32:46 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:21 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:44 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:05 CEST Tobias Imported from Hamamatsu datasheet.