RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2811031651 - Archived data from Fri, 05. February 2021 11:00:04 CET


This is all the information about APD 2811031651. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2811031651
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 10
EP1 batch: 82
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2669272 V     T = -25 °C: 344.9305164 V
Voltage for Gain 150: T = +20 °C: 388.0096787 V     T = -25 °C: 352.2863576 V
Voltage for Gain 200: T = +20 °C: 392.3925449 V     T = -25 °C: 356.4349903 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.585385806 V-1     T = -25 °C: 4.991967873 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.104000624 V-1     T = -25 °C: 9.20117571 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.42594825 V-1     T = -25 °C: 14.26077793 V-1
Break-through voltage: T = +20 °C: 407.497543 V     T = -25 °C: 371.351638 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:06:31 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:41 CEST oafedulidis Updated box and position via API.
03. May 2021 10:27:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:04 CET jreher Updated box and position via API.
03. Feb 2021 18:25:32 CET jreher Updated box and position via API.
11. Aug 2020 18:04:39 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:02 CEST jreher Updated APD location via API.
17. Feb 2020 17:55:24 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:30 CET jreher Updated APD location via API.
27. Nov 2019 19:44:59 CET jreher Updated APD location via API.
25. Nov 2019 17:18:09 CET jreher Updated box and position via API.
20. Aug 2019 12:32:46 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:21 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:44 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:05 CEST Tobias Imported from Hamamatsu datasheet.