Serial: 2811031646
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 7
EP1 batch: 82
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7811653 V     T = -25 °C: 346.2808137 V
Voltage for Gain 150: T = +20 °C: 389.5903283 V     T = -25 °C: 353.7009079 V
Voltage for Gain 200: T = +20 °C: 393.9528821 V     T = -25 °C: 357.856957 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.740422679 V-1     T = -25 °C: 4.775076915 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.220062554 V-1     T = -25 °C: 9.826829037 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.71091902 V-1     T = -25 °C: 15.73651877 V-1
Break-through voltage: T = +20 °C: 408.9772754 V     T = -25 °C: 372.8796259 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:27:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:03 CET jreher Updated box and position via API.
03. Feb 2021 18:25:31 CET jreher Updated box and position via API.
11. Aug 2020 18:04:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:01 CEST jreher Updated APD location via API.
17. Feb 2020 17:55:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:30 CET jreher Updated APD location via API.
27. Nov 2019 19:44:59 CET jreher Updated APD location via API.
25. Nov 2019 17:18:08 CET jreher Updated box and position via API.
20. Aug 2019 12:32:46 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:20 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:44 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:05 CEST Tobias Imported from Hamamatsu datasheet.