RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2811031642 - Archived data from Fri, 05. February 2021 11:00:03 CET


This is all the information about APD 2811031642. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2811031642
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 9.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 9
EP1 batch: 82
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7383217 V     T = -25 °C: 346.1161245 V
Voltage for Gain 150: T = +20 °C: 389.6109607 V     T = -25 °C: 353.5930583 V
Voltage for Gain 200: T = +20 °C: 394.0241722 V     T = -25 °C: 357.783337 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.724743798 V-1     T = -25 °C: 4.770263823 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.143133448 V-1     T = -25 °C: 9.759179871 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.23885394 V-1     T = -25 °C: 15.46125959 V-1
Break-through voltage: T = +20 °C: 409.78495 V     T = -25 °C: 373.3432996 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 15:53:23 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:37 CET jreher Updated box and position via API.
05. Feb 2021 11:00:03 CET jreher Updated box and position via API.
03. Feb 2021 18:25:31 CET jreher Updated box and position via API.
11. Aug 2020 18:04:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:01 CEST jreher Updated APD location via API.
17. Feb 2020 17:55:23 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:29 CET jreher Updated APD location via API.
27. Nov 2019 19:44:59 CET jreher Updated APD location via API.
25. Nov 2019 17:18:08 CET jreher Updated box and position via API.
20. Aug 2019 12:32:45 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:20 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:43 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:05 CEST Tobias Imported from Hamamatsu datasheet.