RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2811031621 - Archived data from Tue, 11. August 2020 18:04:34 CEST


This is all the information about APD 2811031621. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2811031621
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 90
Position in Box: 42
EP1 batch: 81
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0305106 V     T = -25 °C: 347.2639653 V
Voltage for Gain 150: T = +20 °C: 390.870717 V     T = -25 °C: 354.730969 V
Voltage for Gain 200: T = +20 °C: 395.2394004 V     T = -25 °C: 358.9195395 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.521431381 V-1     T = -25 °C: 4.744183982 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.727466434 V-1     T = -25 °C: 9.646567528 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.19639344 V-1     T = -25 °C: 15.23154621 V-1
Break-through voltage: T = +20 °C: 410.3977051 V     T = -25 °C: 374.0904227 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:35:58 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:32 CEST jreher Updated box and position via API.
05. Feb 2021 10:59:59 CET jreher Updated box and position via API.
03. Feb 2021 18:25:27 CET jreher Updated box and position via API.
11. Aug 2020 18:04:34 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:54:59 CEST jreher Updated APD location via API.
17. Feb 2020 17:55:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:28 CET jreher Updated APD location via API.
27. Nov 2019 19:44:50 CET jreher Updated APD location via API.
25. Nov 2019 17:18:06 CET jreher Updated box and position via API.
20. Aug 2019 12:31:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:14 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:43 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:04 CEST Tobias Imported from Hamamatsu datasheet.