RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2811031619 - Archived data from Tue, 11. August 2020 18:04:33 CEST


This is all the information about APD 2811031619. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2811031619
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 7.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 90
Position in Box: 40
EP1 batch: 81
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0077055 V     T = -25 °C: 345.9936879 V
Voltage for Gain 150: T = +20 °C: 388.8190029 V     T = -25 °C: 353.3120137 V
Voltage for Gain 200: T = +20 °C: 393.1577268 V     T = -25 °C: 357.4223923 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.606635099 V-1     T = -25 °C: 4.94248487 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.155008507 V-1     T = -25 °C: 9.266695611 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31430282 V-1     T = -25 °C: 16.65682802 V-1
Break-through voltage: T = +20 °C: 408.551724 V     T = -25 °C: 372.5492815 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:58 CET jreher Updated box and position via API.
03. Feb 2021 18:25:27 CET jreher Updated box and position via API.
11. Aug 2020 18:04:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:54:59 CEST jreher Updated APD location via API.
17. Feb 2020 17:56:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:28 CET jreher Updated APD location via API.
27. Nov 2019 19:44:50 CET jreher Updated APD location via API.
25. Nov 2019 17:18:06 CET jreher Updated box and position via API.
20. Aug 2019 12:31:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:14 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:43 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:04 CEST Tobias Imported from Hamamatsu datasheet.