RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2810031595 - Archived data from Fri, 27. August 2021 11:15:58 CEST


This is all the information about APD 2810031595. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2810031595
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 90
Position in Box: 24
EP1 batch: 81
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.662251 V     T = -25 °C: 343.4751862 V
Voltage for Gain 150: T = +20 °C: 386.517147 V     T = -25 °C: 350.8561587 V
Voltage for Gain 200: T = +20 °C: 390.8878793 V     T = -25 °C: 355.0001961 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.417295578 V-1     T = -25 °C: 4.767473273 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.533660027 V-1     T = -25 °C: 9.676966222 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.78465682 V-1     T = -25 °C: 15.24635286 V-1
Break-through voltage: T = +20 °C: 406.0884624 V     T = -25 °C: 370.4046754 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:32:18 CET oafedulidis Assigned to capsule by script
27. Aug 2021 11:15:58 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:56 CET jreher Updated box and position via API.
03. Feb 2021 18:25:25 CET jreher Updated box and position via API.
11. Aug 2020 18:04:30 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:54:58 CEST jreher Updated APD location via API.
17. Feb 2020 17:56:11 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:27 CET jreher Updated APD location via API.
27. Nov 2019 19:44:49 CET jreher Updated APD location via API.
25. Nov 2019 17:18:04 CET jreher Updated box and position via API.
20. Aug 2019 12:31:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:48:13 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:42 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:03 CEST Tobias Imported from Hamamatsu datasheet.