RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2810031553 - Archived data from Wed, 03. February 2021 18:25:19 CET


This is all the information about APD 2810031553. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2810031553
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2319025747/2810031553
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 89
Position in Box: 41
EP1 batch: 79
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5723795 V     T = -25 °C: 343.3861233 V
Voltage for Gain 150: T = +20 °C: 386.4234368 V     T = -25 °C: 350.7294984 V
Voltage for Gain 200: T = +20 °C: 390.7926125 V     T = -25 °C: 354.8428311 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.418525219 V-1     T = -25 °C: 4.805109351 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.571597382 V-1     T = -25 °C: 9.813407905 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85266062 V-1     T = -25 °C: 15.601826 V-1
Break-through voltage: T = +20 °C: 407.1512838 V     T = -25 °C: 370.2047255 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:50 CET jreher Updated box and position via API.
03. Feb 2021 18:25:19 CET jreher Updated box and position via API.
11. Aug 2020 17:39:40 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:57 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:24 CET jreher Updated box and position via API.
27. Nov 2019 19:44:39 CET jreher Updated APD location via API.
25. Nov 2019 17:18:01 CET jreher Updated box and position via API.
13. Sep 2019 10:31:34 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:57:49 CEST markus.moritz
25. Jul 2019 12:10:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:48:06 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:41 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:01 CEST Tobias Imported from Hamamatsu datasheet.