RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031539 - Archived data from Wed, 07. October 2020 14:22:35 CEST


This is all the information about APD 2809031539. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031539
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1406015495/2809031539
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 13.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 89
Position in Box: 30
EP1 batch: 79
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3310308 V     T = -25 °C: 344.9376497 V
Voltage for Gain 150: T = +20 °C: 388.182919 V     T = -25 °C: 352.3309595 V
Voltage for Gain 200: T = +20 °C: 392.5643588 V     T = -25 °C: 356.475675 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.511573584 V-1     T = -25 °C: 4.950491395 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.797466861 V-1     T = -25 °C: 9.198712644 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.35177116 V-1     T = -25 °C: 16.37323608 V-1
Break-through voltage: T = +20 °C: 408.132144 V     T = -25 °C: 371.5703139 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:49 CET jreher Updated box and position via API.
03. Feb 2021 18:25:18 CET jreher Updated box and position via API.
07. Oct 2020 14:22:35 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:51 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:38 CET jreher Updated APD location via API.
25. Nov 2019 17:18:00 CET jreher Updated box and position via API.
13. Sep 2019 10:31:01 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:53:26 CEST markus.moritz
25. Jul 2019 12:10:40 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:48:06 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:41 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:00 CEST Tobias Imported from Hamamatsu datasheet.