RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031526 - Archived data from Wed, 27. November 2019 19:44:37 CET


This is all the information about APD 2809031526. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031526
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 15.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 89
Position in Box: 20
EP1 batch: 79
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:48 CET jreher Updated box and position via API.
03. Feb 2021 18:25:17 CET jreher Updated box and position via API.
11. Aug 2020 17:39:36 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:37 CET jreher Updated APD location via API.
25. Nov 2019 17:17:59 CET jreher Updated box and position via API.
13. Sep 2019 10:31:00 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:46:14 CEST markus.moritz
25. Jul 2019 12:10:39 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:48:05 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:40 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:00 CEST Tobias Imported from Hamamatsu datasheet.