RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031523 - Archived data from Mon, 10. May 2021 14:01:15 CEST


This is all the information about APD 2809031523. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031523
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 11.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 89
Position in Box: 17
EP1 batch: 79
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.227322 V     T = -25 °C: 347.5872713 V
Voltage for Gain 150: T = +20 °C: 391.0431922 V     T = -25 °C: 354.9983443 V
Voltage for Gain 200: T = +20 °C: 395.3871619 V     T = -25 °C: 359.1573414 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.577833501 V-1     T = -25 °C: 4.706153931 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.046469599 V-1     T = -25 °C: 9.51036351 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.10828948 V-1     T = -25 °C: 15.01815067 V-1
Break-through voltage: T = +20 °C: 410.8504694 V     T = -25 °C: 374.3694308 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:11:24 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:15 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:48 CET jreher Updated box and position via API.
03. Feb 2021 18:25:16 CET jreher Updated box and position via API.
11. Aug 2020 17:39:35 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:37 CET jreher Updated APD location via API.
25. Nov 2019 17:17:59 CET jreher Updated box and position via API.
13. Sep 2019 10:31:00 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:44:38 CEST markus.moritz
25. Jul 2019 12:10:39 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:48:05 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:40 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:00 CEST Tobias Imported from Hamamatsu datasheet.