RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031517 - Archived data from Tue, 11. August 2020 17:39:34 CEST


This is all the information about APD 2809031517. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031517
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 89
Position in Box: 11
EP1 batch: 78
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.826966 V     T = -25 °C: 343.6158977 V
Voltage for Gain 150: T = +20 °C: 386.5887411 V     T = -25 °C: 350.8881379 V
Voltage for Gain 200: T = +20 °C: 390.897178 V     T = -25 °C: 354.9571899 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.736846428 V-1     T = -25 °C: 4.79335764 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.594468487 V-1     T = -25 °C: 9.775683996 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.97330156 V-1     T = -25 °C: 15.66532161 V-1
Break-through voltage: T = +20 °C: 406.3372273 V     T = -25 °C: 369.8736263 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:47 CET jreher Updated box and position via API.
03. Feb 2021 18:25:16 CET jreher Updated box and position via API.
07. Oct 2020 12:19:33 CEST jreher Assigned to capsule by script
06. Oct 2020 16:52:57 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:34 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:37 CET jreher Updated APD location via API.
25. Nov 2019 17:17:59 CET jreher Updated box and position via API.
13. Sep 2019 10:30:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 14:08:45 CEST markus.moritz
25. Jul 2019 12:10:55 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:48:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:40 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:59 CEST Tobias Imported from Hamamatsu datasheet.