RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031516 - Archived data from Tue, 11. August 2020 17:39:34 CEST


This is all the information about APD 2809031516. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031516
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 13.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 89
Position in Box: 10
EP1 batch: 78
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3546982 V     T = -25 °C: 344.997757 V
Voltage for Gain 150: T = +20 °C: 388.2008207 V     T = -25 °C: 352.3895143 V
Voltage for Gain 200: T = +20 °C: 392.5810425 V     T = -25 °C: 356.5430709 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.548685863 V-1     T = -25 °C: 4.938717856 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.920486096 V-1     T = -25 °C: 9.210676144 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.83177855 V-1     T = -25 °C: 14.58852068 V-1
Break-through voltage: T = +20 °C: 408.1335677 V     T = -25 °C: 371.728055 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:47 CET jreher Updated box and position via API.
03. Feb 2021 18:25:16 CET jreher Updated box and position via API.
07. Oct 2020 12:26:25 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:33 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:34 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:53 CET jreher Updated box and position via API.
27. Nov 2019 19:44:36 CET jreher Updated APD location via API.
25. Nov 2019 17:17:59 CET jreher Updated box and position via API.
13. Sep 2019 10:30:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 14:08:26 CEST markus.moritz
25. Jul 2019 12:10:55 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:48:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:40 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:59 CEST Tobias Imported from Hamamatsu datasheet.