RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031507 - Archived data from Wed, 16. June 2021 16:00:12 CEST


This is all the information about APD 2809031507. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031507
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 10.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 89
Position in Box: 2
EP1 batch: 78
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5206119 V     T = -25 °C: 345.9948671 V
Voltage for Gain 150: T = +20 °C: 389.3336764 V     T = -25 °C: 353.4029679 V
Voltage for Gain 200: T = +20 °C: 393.6678182 V     T = -25 °C: 357.5329396 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.417230311 V-1     T = -25 °C: 4.8943639 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.672125311 V-1     T = -25 °C: 9.037541502 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05306488 V-1     T = -25 °C: 16.15064074 V-1
Break-through voltage: T = +20 °C: 408.6711968 V     T = -25 °C: 372.2818566 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:42:39 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:57 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:12 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:46 CET jreher Updated box and position via API.
03. Feb 2021 18:25:15 CET jreher Updated box and position via API.
11. Aug 2020 17:39:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:36 CET jreher Updated APD location via API.
25. Nov 2019 17:17:58 CET jreher Updated box and position via API.
13. Sep 2019 10:30:42 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 14:03:26 CEST markus.moritz
25. Jul 2019 12:10:54 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:48:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:40 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:59 CEST Tobias Imported from Hamamatsu datasheet.