RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031487 - Archived data from Fri, 05. February 2021 10:59:43 CET


This is all the information about APD 2809031487. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031487
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 88
Position in Box: 45
EP1 batch: 78
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8038008 V     T = -25 °C: 349.12338 V
Voltage for Gain 150: T = +20 °C: 392.6164097 V     T = -25 °C: 356.5792392 V
Voltage for Gain 200: T = +20 °C: 396.9384519 V     T = -25 °C: 360.72763 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.694515707 V-1     T = -25 °C: 4.821933398 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.36625454 V-1     T = -25 °C: 9.859804078 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72333157 V-1     T = -25 °C: 15.66892217 V-1
Break-through voltage: T = +20 °C: 410.6412354 V     T = -25 °C: 374.8158222 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:22:45 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:02 CEST jreher Updated box and position via API.
05. Feb 2021 10:59:43 CET jreher Updated box and position via API.
03. Feb 2021 18:25:12 CET jreher Updated box and position via API.
11. Aug 2020 17:39:31 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:28 CET jreher Updated APD location via API.
25. Nov 2019 17:17:57 CET jreher Updated box and position via API.
13. Sep 2019 10:30:42 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 14:00:34 CEST markus.moritz
25. Jul 2019 12:10:54 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:39 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:58 CEST Tobias Imported from Hamamatsu datasheet.